Midland uses Bigfoot CMMS software for managing our maintenance department.
Bigfoot has done a profile on us, and how we use the software in conjunction with our ISO procedures and compliance, currently at Reliable Plant and will be published in several other plant engineering magazines over the next several months.
The above link will take you to the article and interview with B.J. McDonald, co-owner and Director of Facilities.
Thursday, January 10, 2013
Tuesday, December 11, 2012
Solar Panel Project - Live as of 12/11/2012
Today Midland went live with our solar panel project. We've installed a 86.4 KwH system which will generate between 10% - 15% of our factory's energy needs. This is one of the largest private installations of solar panels in the state of Illinois.
Monday, November 12, 2012
Midland's Solar Panel Project
As part of our on-going commitment to sustainability Midland is now employing solar panels to provide a percentage of our energy needs.
Solar energy is a continuously renewable resource and produces power free of greenhouse gases, reducing our carbon footprint.
Pictures of the Solar Panel Project:
Solar energy is a continuously renewable resource and produces power free of greenhouse gases, reducing our carbon footprint.
Pictures of the Solar Panel Project:
Friday, October 19, 2012
Launch of Powdercoating Line
NEWS RELEASE
MIDLAND METAL PRODUCTS
BEGINS OPERATION OF A STATE OF THE ART POWDERCOATING LINE
OCTOBER 19, 2012, CHICAGO, IL
. . . Midland Metal Products, a leading metal fabricator for the retail
advertising industry, is proud to announce the startup of a new, state of the
art powder coating system at its production facility in Chicago. This
significant investment continues Midland’s deep commitment to customer
satisfaction by accelerating delivery lead times, improving quality, and
reducing production costs.
The line is sized to accommodate a wide range of
components – the maximum size is 36” deep, 72” long, and 120” wide. An automated
800 foot conveyor system carries components through a 3 stage pre-treatment
system, a dry-off oven, dual powder booths, and a final cure oven. The
most unique feature of the system is the quick change capability that supports
a switch from one powder coat color to the next in less than 30 seconds. To
satisfy the changing demands of our customers, a wide variety of colors will be
available. The system was also designed with a long loading &
unloading area positioned adjacent to Midland’s existing assembly &
packaging area. This will allow personnel to complete final operations on
the line and positions the parts close to final pack out for reduced handling
and maximize efficiency.
Monday, June 11, 2012
Midland Metal Products is ISO 9001-2008 Certified
As of June
11, 2012 Midland Metal Products is registered with ISO for Design, Engineering,
Manufacturing, Assembly, Packaging, and Distribution of Custom Metal
Products. We at Midland Metal Products
are extremely honored to join such elite company within the ISO community. Our long journey to certification may have taken a huge leap
but our insistence on improvement and innovation will not wane.
The road to
certification was an excellent opportunity to not only display our pride in our
operation but also to analyze areas of improvement. We are happy to be recognized for our high standards
of work throughout the company including such areas as Quality Management,
Management Responsibility, Resource Management, Product Realization,
Measurement, Analysis, and Improvement.
With our new certification, we look forward to continuing the
outstanding quality of our work.
An aspect of
ISO 9001 which makes us especially proud of our certification is the
requirement for persistent quality and control.
In order to retain certification, all ISO 9001 certified companies must
maintain the high level of service they displayed during their certification process. The ISO process continues to be a diligent
endeavor even after certification with controls such as internal and external
audits, continued control of documents, and dependable corrective and preventative
action. Midland Metal Products is
looking forward to continuing the high level of work we have exhibited for over
80 years with our new ISO 9001 certification.
Please contact
your sales exec for details on the scope of our certification and requests for
documents.
Tuesday, April 24, 2012
ISO 9001
Midland has been working toward ISO 9001 certification and we’re now in the final stretch. We have our Stage One audit scheduled for April 30th and our Stage Two audit May 30th – June 1st 2012. Barring any unforeseen circumstances, we expect to receive certification shortly.
It’s been a very interesting process for us and we’ve learned quite a bit. For instance, we’ve learned that the idea that ISO is a cumbersome bureaucratic nightmare is a myth. It really boiled down to fourteen pages of standards, a great training consultant, a lot of work in documenting all the things we were already doing well, and implementing the opportunities for improvement that we found along the way. It’s a dichotomy how the preparation can seem, at times, as if it’s adding complexity but the end result is a streamlined system with increased efficiency across the board.
We’ve also learned that nothing facilitates companywide transparency like internal audits! The auditing process is a window into every part of the process from Sales and Design to Shipping and every step in between – we’ve all learned a lot about how everyone here at Midland plays a vital role in meeting our shared goal: satisfying our customers.
The subject of customer satisfaction is a perfect segue to share our Quality Policy:
“Midland Metal Products is committed to satisfying our customers. We accomplish this by deeply understanding our customer needs and by maintaining a rigorous system utilizing advances in engineering and process technology. This enables us to deliver high quality products, at the right time, at the lowest possible cost. We pursue excellence through continuous improvement.”
This sentiment has been embodied in every project Midland has manufactured since 1929…our Quality Manual for ISO 9001 just gave us a place to put it in writing.
*Our Quality Manual and procedures available to customers upon request.
CNC Mesh Welder
In the POP industry, there is a plethora of standard wire
grid work. We utilize in-house fixturing
designed in SolidWorks and fabricated in plastic composite to ensure that our
wire products meet the exacting standards of our customer. Our automated equipment welds the cut to
length wires into the finished wire grid work.
This video demonstrates one of our machines in action.